16th lesson 9th May 2007

By martinsillaots

Plan:
1. The topic of the lesson is project execution and control. Methods and techniques. Unfortunately this topic does not affect students practically at this moment. They have to execute their project later on summer.
2. Review and correction of existing project plan.

Report:
Just few minutes before the beginning of the lesson I got project plans drafts from all of the teams. Positive is, that they had done something. Negative is that most of those project plans are created during the lesson. They try to avoid the homework.

During the project plan review and correction process we had lot of problems with internet connection and with Google Docs environment. It’s very painful to integrate previously created small Google documents in to bigger document. Sometimes the copy-paste function forgets the format of text and table. Students were in anguish. I feel sorry for that. Maybe it’s wise to create the master document in Google Docs that has only references to existing subdocuments.

The presentation of topic of project execution was successful. At least half of the students worked actively. They answered to relevantly to my questions and also raised additional questions. Very good!

Overall rate to lesson 5-. I’m a bit sick.